logo_modulyss head_arrow
  • downloads |
  • language
    • nl
    • fr
    • en
    • de
    • es
    • pl
    • ru
  • legal
  • privacy
icon_printer icon_facebook icon_linkedin icon_twitter icon_blog icon_wishlist
home > csr > back2back
  • modulyss
    • mission
    • company
    • production process
    • quality control
    • 50-point programme
    • calendar
  • it's a tile
    • product description
    • advantages carpet tiles
    • advantages bitumen
    • installation instructions
    • maintenance instructions
  • products
    • collections
      • collection
    • product search
    • mix&match
      • mixmatch
        • 01 First
        • 05 On-line 2
        • 06 Step
        • 12 Round-up
        • 13 Strepqes C
        • 13 Strepqes L
        • 14 Cambridge
        • 16 Shine-up
        • 18 Normal
        • 19 First Lines
        • 23 First Absolute
    • wishlist
  • projects
  • csr
    • eco-products
    • back2back
    • CARE
    • eco-processes
    • social responsibility
    • economical responsibility
  • contact
    • location
    • itinerary
    • contact form

back2back

This is not garbage!

At modulyss® this is primary material for the secondary backing. 

back2back

Cutting the platines into carpet tiles of 50x50 cm
--> 3 % waste


Why 3 % waste ? To create the perfect seams

back2back

Transporting the carpet tile waste via a conveyor

back2back

Adding ‘3rd choice’ carpet tiles.
 

back2back

Shredding the carpet tile waste & adding additives.
 

back2back

Separating the primary raw material and air by a cyclone.

back2back

Result of the separating proces.
 

back2back

The primary raw material goes into a hopper (silo).
 

back2back

All raw materials go into the extruder --> bitumen
 

back2back

Adding the bitumen onto the carpet.

back2back

Result:

10 % of modulyss® carpet tile waste is added to the secondary backing
 

1/11